ISO 9001, 27001, 27701, 27017, 27018 certified
Articles

Concrete delivery intelligence: proof of delivery, anti-mix and pour counting

MIS26 · 16 July 2026

Concrete delivery intelligence: proof of delivery, anti-mix and pour counting

In the concrete business, most arguments start where the documentation ends. The customer claims the truck was late, that less arrived than ordered, or that the pour happened at the wrong spot - and without proof, settlement turns into negotiation. Cameras and an AI computer on the mixer close that gap: every pour is documented with time, location and video of the actual discharge.

The second pain is more critical: mixing. Loading from the wrong silo or discharging at the wrong site can ruin an entire pour. Computer vision that reads the container or silo assignment sticker and checks it against the order raises an alert before discharge - at the moment the mistake can still be stopped.

The third pain is money burned on waiting. A mixer idling for an hour on site is a direct cost. When the system automatically detects site entry, pour start and exit, you get a KPI per contractor and site: who delays, how long, and what it costs by month-end. Counting pours against orders completes the plan-vs-actual picture.

The bottom line: a concrete mixer stops being just a hauler and becomes a measurement point. Proof of delivery per pour, mix protection before it happens, and waiting-time measurement - all on the same fleet platform, connected to the ordering system.

Contact Us

Contact us