ISO 9001, 27001, 27701, 27017, 27018 certified
Articles

Digital weigh tickets and earthworks hauling: from paper in the pickup to Proof to Payment

MIS26 · 6 July 2026

Anyone who has run an earthworks project knows the ritual: truck on the scale, clerk prints a ticket, the ticket rides in a pickup, and at month end someone faces a pile trying to work out how many rounds really happened, where each truck went, and why contractor and client count different numbers. On a project with dozens of trucks a day, those gaps are worth serious money - to both sides.

Globally this is already a regulatory matter: the US Federal Highway Administration ran a national e-Ticketing program for infrastructure projects, 43 state DOTs adopted it, and per industry publications a dozen states already require digital ticketing on their projects. The direction is clear: the paper slip's career is ending.

But a digital ticket solves only half the problem - it documents that a weigh-in happened, not what actually happened on the road and at the site. That is the layer we built: video documentation around the vehicle across the whole round - loading, haul, dump - with automatic event detection tied to weighing and location data. We call it Proof to Payment: every round arrives at settlement with complete proof, and the end-of-month argument simply dries up.

The operational result: settlement closed in days instead of weeks, drivers no longer blamed for what they did not do, and a client who sees in real time how much material actually moved. There is an important by-product - safety: an earthworks truck with surround video coverage is driven differently, and the documentation serves the contractor in any damage or road-event inquiry.

For Israeli earthworks and infrastructure contractors, this is a chance to get ahead of the market: whoever shows up to the next tender with full digital documentation offers the client a transparency competitors cannot match - and buys himself a quiet month end.

Contact Us

Contact us